Haditha Hospital Operating Rooms Project

7 ISO Class 5 / Class 7 operating rooms for a 400-bed hospital, completed in 3 months in 2023 — interlocked entrance, hermetic doors, 2400x2400 mm laminar ceiling with H14 HEPA filtration.

Haditha, Anbar, IraqMedical / Hospital
Location
Haditha, Anbar, Iraq
Completed
In 3 months, 2023
Industry
Medical / Hospital
Application
Operating Rooms
Size
1,280 m²
OR Classification
ISO 14644-1 Class 5 (LAF Zone) / Class 7 (Operating Room)
Haditha Hospital Operating Rooms Project - 1
Haditha Hospital Operating Rooms Project - 2
Haditha Hospital Operating Rooms Project - 3
Haditha Hospital Operating Rooms Project - 4
Haditha Hospital Operating Rooms Project - 5
Haditha Hospital Operating Rooms Project - 6
1 / 6

Project Scope

The operating rooms of a 400-bed hospital were designed and built in just 3 months in 2023. There are 7 operating rooms in total in this area with an interlocked entrance, all classified as ISO 14644-1 Class 5 / Class 7. The project marked the first phase of an ongoing operating room program delivered for the same healthcare client.

Hermetic Door Systems

The doors of Operating Rooms are touch-free hermetic system which prevents air-leakage.

  • Touch-Free Hermetic Doors
  • Air-Leakage Prevention
  • Interlocked Entrance System

Laminar Ceiling & HEPA Filtration

There are 2400x2400 mm laminar ceiling with H14 HEPA filter at the center of each room to maintain laminar flow requirement during the operations.

  • 2400x2400 mm Laminar Ceiling
  • H14 HEPA Filter
  • Laminar Flow During Operations

Return Air Grilles

SS304 low and high return grilles are located both top and the bottom of the 45° corner to prevent any dirty air accumulation inside the room.

  • SS304 Return Grilles
  • 45° Corner Mounting
  • Low and High Position